The project in short

We removed the old, tired decking in a back garden and replaced it with a fresh new timber deck. The photos show the timber frame and boards going down, then the finished raised deck with a balustrade, steps and planters. We posted it on our Facebook page on 22 August 2026. This is an example job: we do not publish customers' names or addresses.

From frame to finished deck

Building it

The frame and the first boards.

Early on: the timber-clad side of the raised area, with a ladder and stacked boards in front.
The joist frame going down, with decking boards stacked ready beside it.
Boards half laid, with the joists still showing at the far end.
Boards being laid from one side, with the frame still bare beyond them.

Finished

The deck, its steps and balustrade.

From the patio: the timber-clad side, steps and a balustrade along the top.
The balustrade and steps at one corner, with a planter on the deck.
The full width of the deck facing the back of the houses.
The steps up to the deck by the house, with planters either side.

Replacing old decking: look at the frame first

The boards are what you see, but the frame underneath decides how long a deck lasts. If old joists are rotten, new boards laid over them will not last. That is why replacing a deck starts with taking the old one up and checking what is under it.

We also build other garden timber, which you can see on our carpentry page and our landscaping page.

Is planning permission needed for a raised deck?

The Planning Portal says decking up to 30cm above the ground is permitted development for houses, subject to conditions. Higher platforms, flats and some designated areas are treated differently, and a local Article 4 Direction can remove the allowance. Read the Planning Portal guidance on decking before you build.

This deck has a balustrade and steps. This page does not give its height.

What to check

Question to askWhy it mattersWhat this job shows
How high will the deck sit above the ground?Over 30cm above the ground, a house generally needs planning permission.A raised deck with steps and a balustrade. This page gives no height.
Is it a house or a flat?The 30cm allowance applies to houses, not flats.The photos show a garden behind a row of houses. We do not state the property type.
Is the home listed, or in an Article 4 area?Listed buildings and Article 4 Directions can remove the allowance.The photos do not show this. Check with the council.

Questions we get asked

Do you build and replace decking?

Yes. We removed old decking and built a new timber deck, as shown above.

Do you take the old decking away?

On this job we removed the old, tired decking and replaced it with a new timber deck, as we posted at the time.

Where do you work?

Brighton and Hove, and the wider Sussex area.

What are you planning?

Tell us about the job in a few quick taps. It goes straight to us, not a call centre.

Your project1 of 6

What is the job?

Tap an answer to move on.